Services provided; Design, Construction, Test & Commission, ESA Inspection and certification.
DOL Starter Panel for 600V 8KW Sump pump – Civil & Tunneling
Related Projects
Mobile Site Power Distribution Module 120/240V 200A – Civil (Temporary Power)
Design and construction services provided. Module fabricated to be weatherproof. 200A Meter base, 200A Distribution panel, 20A 120V GFCI receptacles,…
Custom variable speed cyclone pump control panel – water treatment
Design, construction, installation and commissioning services provided. 2*75KW Variable Frequency Drives controlling two cyclone pumps. Speed display on panel door,…
ESA Field Evaluation of DSE Centrifuge – water treatment
Inspection, installation and commissioning services provided. Deficiency list compiled. Components changed to CSA approved components. Several circuits rewired to be…
Custom PLC Control Panel – OEM/Tunneling
Construction and commission services provided. Engineered drawings received. Compilation of material take off and procurement of components required. Control panel…